Shopping cart

You have no items in your shopping cart.
View More »

Subscribe to newsletters

Filter your results
Filter by price
per page
 1 2

Incident Log

Incident Log
$0.00 excl tax

Jigsaw Safe Work Method Statement

A jigsaw is used to cut arbitrary curves and designs or other custom shapes into a piece of wood or similar material. Risks include cutting, dust, noise, entanglement, slips, trips and falls.
$78.95 excl tax

Metal Ban Saw Safe Work Method Statement

A metal horizontal bandsaw is a power tool that cuts metal. It uses a metal blade with teeth along one edge. to cut various work pieces.
$78.95 excl tax

Nail Gun Safe Work Method Statement

Discharging of nails and the pressurisation of air has the potential to cause harm through direct nail projectiles and indirect ricochets. This safe work procedure guides the user to considerations when operating a nail gun.
$78.95 excl tax

Risk Assessment and Risk Control Worksheet

Risk Assessment and Risk Control Worksheet
$0.00 excl tax

Risk Assessment Matrix

Risk Assessment Matrix
$0.00 excl tax

Scissor Lift Safe Operating Procedures

The Scissor Lift Safe Operating Procedure covers aspects including pre-use checks, general operational use and after use in checklist format.
$78.95 excl tax

Wood Lathe Safe Work Method Statement (Wood Lathe SWMS)

A wood lathe is a specific piece of plant equipment used to machine wood by removing material from a rotating work piece. Various cutting pieces are used to shape and craft wood. e.g. tool bits, drill bits, wood crafting tools).
$78.95 excl tax

Angle Grinder Safe Work Method Statement_Angel Grinder SWMS

Angle grinders are one of the most dangerous hand tools to use PPE Safety Notes Planning Preparation Pre- operational inspection Installation Emergency Procedures References
$78.95 excl tax

Bench Grinder Safe Work Method Statement

Bench grinders are one of the most commonly used tools in metal fabrication. Generally they are safe and reliable if care is taken with the grinding wheels
$78.95 excl tax

Paint Stripping Safe Work Method Statements

Paint stripping solvent and fumes can cause long term damage to skin, eyes and lungs.
$78.95 excl tax

Concrete Pumping Safe Work Method Statement (SWMS Concrete Pump )

Some of the hazards that come with concrete pumping inlcude burst piples and fittings, slips trips and falls, hearing damage and explosions.
$78.95 excl tax